F Series Parallel Helical Gear Motor with Flange Mounted

F Series Parallel Helical Gear Motor with Flange Mounted

F collection Parellel Shaft-CZPTcal Geared Motor Qualities

one. Attributes:

  1. Substantial efficiency: 92%-ninety four%
  2. Parallel output, compact construction, huge output torque, smooth operation, low noise and extended service life.
  3. Large precision: the gear is created of higher-quality alloy metal forging, carbonitriding and hardening treatment, grinding approach to ensure high precision and stable managing.
  4. Large interchangeability: hugely modular, serial design and style, powerful flexibility and interchangeability.

2. CZPT parameters

Ratio 3.77-276.seventy seven
Input electrical power .12-200KW
Output torque three.5-21700N.m
Output speed five-352rpm
Mounting kind Foot mounted, foot mounted with sound shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined gap, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. 
Input Strategy Flange enter(AM), shaft input(Ad), inline AC motor input, or AQA servo motor
Brake Launch HF-guide release(lock in the brake launch position), HR-handbook release(autom-atic braking situation)
Thermistor TF(Thermistor security PTC thermisto)
TH(Thermistor safety Bimetal swotch)
Mounting Place M1, M2, M3, M4, M5, M6
Variety F37-F157
Output shaft dis. 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, 90mm, 110mm, 120mm
Housing content HT200 large-strength cast iron from R37,forty seven,fifty seven,67,seventy seven,87
Housing material HT250 High strength forged iron from R97 107,137,147,
157,167,187
Warmth treatment technology carbonitriding and hardening remedy
Efficiency 92%-ninety four%
Lubricant VG220
Security Class IP55, F class

CZPTshine Generate

ZheJiang CZPTshine Push Co.,Ltd,the predecessor was a point out-owned navy mould enterprise, was proven in 1965. CZPTshine specializes in the full electricity transmission solution for substantial-stop equipment manufacturing industries primarily based on the purpose of “System Product, Software Style and Professional Provider”.
CZPTshine have a strong complex power with over 350 employees at current, such as over 30 engineering technicians, 30 top quality inspectors, covering an spot of 80000 square meters and types of sophisticated processing machines and screening equipments. We have a good basis for the market application growth and provider of substantial-end pace reducers & variators proudly owning to the provincial engineering engineering study centre,the lab of equipment pace reducers, and the base of modern R&D.

Our Staff

Good quality Control
Quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
merchandise is a product inspection to determine the qualified products.

7. Certification.
All our products get ISO & CE & UL certification.

Packing

Shipping and delivery

 

F Series Parallel Helical Gear Motor with Flange Mounted