F Series Helical Parallel Geared Motor with Hole Shaft

F Series Helical Parallel Geared Motor with Hole Shaft

F series Parallel Shaft-CZPTcal Geared Motor Attributes

1.Functions:

  1. High performance: 92%-94%
  2. Parallel output, compact framework, massive output torque, clean procedure, minimal noise and prolonged provider daily life.
  3. Higher precision: the gear is manufactured of higher-high quality alloy metal forging, carbonitriding and hardening treatment, grinding method to make sure substantial precision and secure working.
  4. Large interchangeability: highly modular, serial design and style, robust flexibility and interchangeability.

two. CZPT parameters

Ratio 3.seventy seven-276.seventy seven
Input energy .twelve-200KW
Output torque three.5-21700N.m
Output pace 5-352rpm
Mounting kind Foot mounted, foot mounted with strong shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined gap, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. 
Enter Method Flange input(AM), shaft input(Advert), inline AC motor enter, or AQA servo motor
Brake Launch HF-guide release(lock in the brake launch position), HR-guide release(autom-atic braking position)
Thermistor TF(Thermistor safety PTC thermisto)
TH(Thermistor security Bimetal swotch)
Mounting Position M1, M2, M3, M4, M5, M6
Sort F37-F157
Output shaft dis. 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, 90mm, 110mm, 120mm
Housing substance HT200 higher-energy cast iron from R37,47,57,67,77,87
Housing materials HT250 High strength solid iron from R97 107,137,147,
157,167,187
Heat treatment technology carbonitriding and hardening treatment
Effectiveness 92%-ninety four%
Lubricant VG220
Safety Class IP55, F class

CZPTshine Travel

ZheJiang CZPTshine Travel Co.,Ltd,the predecessor was a point out-owned army mould business, was established in 1965. CZPTshine specializes in the total electricity transmission remedy for high-end products production industries primarily based on the intention of “System Solution, Software Style and Specialist Service”.
CZPTshine have a powerful technical force with more than 350 staff at present, which includes above thirty engineering technicians, thirty high quality inspectors, covering an region of 80000 sq. meters and types of innovative processing equipment and tests equipments. We have a excellent basis for the market application advancement and provider of large-end speed reducers & variators owning to the provincial engineering engineering analysis center,the lab of equipment pace reducers, and the base of modern day R&D.

Our Staff

Top quality Management
High quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
solution is a product inspection to determine the qualified products.

seven. Certification.
All our items get ISO & CE & UL certification.

Packing

Supply

F Series Helical Parallel Geared Motor with Hole Shaft