DC Blushless Equipment Motor | ||||||
G | five | BLD(P) | 200 | 36 | GN | 30S |
Business Code | Mounting Flange | Motor Variety | Output Energy | Voltage | Shape of Motor Shaft | Motor Speed |
G – GPG | 2-60mm three-70mm 4-80mm five-90mm 6-100mm |
BLD – Brushless motor with square gearbox BLDP – Brushless motor |
ten – 10W 15 – 15W 25 – 25W 40 – 40W 60 – 60W ninety – 90W 200 – 200W 400 – 400W |
24 – DC24V 36 – DC36V 48 – DC48V one hundred ten – DC110V 220 – DC220V |
GN – CZPT CZPTcal Equipment GU – Reinforced CZPTcal Gear A1 – Milling Keyway A – Flat type |
15S – 1500RPM 18S – 1800RPM 25S – 2500RPM 30S – 3000RPM |
Gearbox | ||||||
five | GN | 60 | RT | |||
Design & Dimension | Gear Variety | Reduction Ratio | CZPT Type | |||
two: 60mm four: 80mm 5: 90mm six: 104mm |
GN: CZPT CZPTcal Equipment GU: Reinforced CZPTcal Equipment |
fifty: Reduction Ratio one:sixty 10X Denotes The Mid-gearbox Ration one:ten |
RT – Right-Angle RC – Proper-Angle Hollow |
Motor Performance Parameters | |||||||||||||||||||||
Design | Voltage | No-load Existing | No-load Speed | Rated Energy | Rated Current | Rated Velocity | Rated Torque | Quality Defense | |||||||||||||
V | A | RPM | W | A | RPM | N.m | IP | ||||||||||||||
G5BLD200-24GN-30S | 24 | MAX .80 | 3500 | two hundred | 10.5 | 3000 | .sixty four | 44 | |||||||||||||
G5BLD200-36GN-30S | 36 | MAX .65 | 3400 | seven. | |||||||||||||||||
G5BLD200-48GN-30S | forty eight | MAX .forty five | 3300 | five.2 | |||||||||||||||||
Motor Design | |||||||||||||||||||||
Variety | Pinion Shaft | Round Shaft | |||||||||||||||||||
Lead Wire | G5BLD200-24GN-30S | G5BLD200-24A1-30S | |||||||||||||||||||
G5BLD200-36GN-30S | G5BLD200-36A1-30S | ||||||||||||||||||||
G5BLD200-48GN-30S | G5BLD200-48A1-30S | ||||||||||||||||||||
Parallel Shaft Gearhead (Marketed Independently) | |||||||||||||||||||||
Gearhead Type | Gearhead Product | Equipment Ratio | |||||||||||||||||||
Prolonged Daily life, Minimal Sounds | 5GN/GU _ RC/RT | three, 3.6, 5, 6, 7.five, nine, 12.five, fifteen, eighteen, twenty five, 30, 36, 50, sixty, 75, 90, 100, one hundred twenty, a hundred and fifty, a hundred and eighty, 200 |
|||||||||||||||||||
5GU10XK ( Decimal Gearhead ) | |||||||||||||||||||||
Allowance Torque Unit: Upside (N-m) / Belowside (kgf.cm) | |||||||||||||||||||||
Equipment Ratio | 3 | three.6 | five | 6 | seven.five | 9 | twelve.five | fifteen | 18 | twenty five | 30 | 36 | 50 | sixty | 75 | 90 | one hundred | 120 | a hundred and fifty | 180 | 200 |
r/min Output Shaft Velocity | one thousand | 830 | 600 | 500 | four hundred | 330 | 240 | two hundred | 166 | 120 | a hundred | eighty three | sixty | 50 | forty | 33 | thirty | twenty five | twenty | 16 | 15 |
GU Allowance Torque N·m | one.fifty five | 1.86 | 2.58 | three.09 | three.87 | 4.64 | 5.81 | six.ninety seven | eight.37 | 10.five | 12.6 | 15.1 | twenty | 20 | twenty | 20 | 20 | twenty | 20 | 20 | twenty |
Taibang Motor CZPT Team Co., Ltd. is a expert manufacturer which merged with collection equipment transmission merchandise of design and style, manufacture, and sale promotion.
• occupied much more than thirty,000 square meters, experienced more than 1000 employees, and more than 200 sets of innovative tools,
• operated strictly in accordance to ISO9000 Quality management program.
• give you with far more than just substantial-overall performance goods, much more market end users personalized package of application solutions,
• based mostly on corporate concerns, to provide customers with the most suited goods, the most suitable remedy.
• Guide client innovation via the goods and support, support the buyer recognize the optimum gain.
• 1995: Taibang Firm and the Ministry of Aerospace, Peking University,
and scientific investigation authorities jointly set up a micro-micro motor production business
• 2000: Taibang established a branch in HangCZPT, ZHangCZPTg
• 2005: ZHangCZPTg Taibang Motor Sector Co., Ltd. set up HangCZPT ZheJiang State-owned CZPT Co., Ltd.
• 2012: Set up ZheJiang Taibang Car Co., Ltd.
• 2014: Authorized the new factory website of the next stage of the HangCZPT National Financial Park in ZHangCZPTg Province,
which is anticipated to be finished and put into procedure in 2018
• 2018: A new one hundred twenty,000 square meters automated manufacturing foundation